項 目 介 紹
Project introduction
該工程長20米,寬14.8米,膜體高11.6米,前端懸挑11.72米。屬于骨架支撐式與張拉式相結合的膜結構,膜面呈傘狀,考慮懸挑較長及膜單元長寬比例,在前端加設一榀弧形梁,保證膜面不會積水,同時增強了整體造型的層次感。
Gansu Police Academy Training Ground Membrane Structure
This project is 20m long, 14.8m wide and 11.6m high. The front cantilever is 11.72m. This membrane structure is a combined membrane structure. A curved beam is designed in the front of the cantilever to prevent rain ponding.
竣工時間:2013年10月 Completion time: Oct. 2013
建設地點:甘肅 Construction site: Gansu
結構形式:張拉式和骨架式相結合 Structure form: Tension structure and framework structure
膜 面 積:800平米 Membrane area: 800 square meters
膜材型號:杜肯 B6915 PVDF膜材 Membrane material: Duraskin B6915 PVDF